On Monday, March 11, 2024, the official sales launch of apartments in the residential complex HILLSIDE by ISATIS Construction Group began, which will be located in the picturesque Tatlisu.
The project will be situated just 500 meters from the sea. The total number of apartments is 102, spread across 9 blocks. The total area of the residential complex is 19,000 m2.
The living area of studios is 33 m2, and 1+1 apartments are 53m2.
The price of studios starts from 95,000 GBP, and 1+1 apartments start from 138,000 GBP.
Studios and 1+1 apartments on the first floor have access to a terrace and a courtyard, while apartments on the second floor have their own rooftop terrace for studios with an area of 33m2 and 52m2 for 1+1 apartments. All apartments have their own balcony with an area of 10m2.
The project offers apartments with sea views as well as apartments with mountain views. The complex will be equipped with rich infrastructure, including: indoor swimming pool, 3 outdoor swimming pools, SPA, gym, children's and sport playgrounds, snack bar, 24-hour reception, and shuttle service to the beach.
The standard finishing of the apartments includes plastered and painted walls, electrical appliance outlets, interior doors, fully equipped bathrooms, kitchen cabinets, as well as underfloor heating in bathrooms and SMART-Home system elements.
ISATIS offers buyers 3 types of payment plans with the possibility of receiving a discount:
Payment Plan 1
- Deposit 5%
- First Payment 35% in 1 month including the nonrefundable deposit Installments
- 65% in 42 months
- VAT 5% on Key Handover (01/03/2027)
- Utility Connection 3000 GBP on Key Handover (01/03/2027)
Payment Plan 2 - OFFER 2% Discount
- Deposit 5% First Payment
- 50% in 1 month including the nonrefundable deposit Installments
- 50% in 36 months
- VAT 5% on Key Handover (01/03/2027)
- Utility Connection 3000 GBP on Key Handover (01/03/2027)
Payment Plan 3 - OFFER 5% Discount
- Deposit 5% First Payment
- 50% in 1 month including the nonrefundable deposit Installments
- 50% in 1 month
- VAT 5% on Key Handover (01/03/2027)
- Utility Connection 3000 GBP on Key Handover (01/03/2027)
The completion of the residential complex construction and key handover will take place in March 2027.
During the first 2 weeks after the sales launch, an additional 5% discount is offered.